Chake Chake Hospital
of Pemba – Defects Assessment
A general hospital complex was newly built with
funds of the European Union on a hilltop location
and after opening to the general public developed
during the defects liability period not correctable
defects caused by a landslide which lead the Ministry
of Health of the Revolutionary Government of Zanzibar
to close it temporarily as it was considered a risk
to the lives of the users. 3D design-development-display,
Barnert, Bauer OEG were called in to conduct an
assessment and prepare a defects report recommending
remedies so that the defects of the hospital could
be corrected and thereafter reopened.
Technical Assistant: |
3D design-development-display,
Barnert, Bauer OEG |
Core sampling: |
Benwell Engineering |
Sample testing: |
Technical University of
Dar es Salaam |
Structural Engineer: |
Boga of Kenya |
Programme Manager: |
Gorden Street on behalf
of the EU |
Cost: |
75,000 € funded by
the European Union |
Remedial works cost: |
0,5 M € funded by the
European Union |